Gallery
Foundation construction for the house
The slab foundation construction on Svīres Street includes site preparation, installation of formwork and reinforcement, followed by concrete pouring and curing. Afterward, the foundation surface is finished and waterproofed to ensure its durability and stability.
The assembly process
Take a look at how your dream home is coming to life!
Pressure Test
Before conducting the building pressure test, all installation works for utilities that cross through the structure (electricity cables, water and sewage pipes, and ventilation ducts) are completed. This ensures that we can objectively verify the quality of the work and the correct sealing of all enclosing structures.
During the test, we are always present to immediately address any issues if necessary. Only after these steps are completed do we proceed with the remaining work. Enclosing structures are no longer penetrated. The pressure test serves both as our internal quality control and as proof to the client that even the work that cannot be inspected after the house is completed has been done correctly.
Malmö module
The projects offer various interior and exterior finishing solutions, and it is also possible to make changes to the room layouts.
The assembly process for the Vītolu Street project in Latvia
Our priority is to provide clients with not only visual and functional enjoyment but also long-term value by using the safest technologies for the home’s sustainability and energy efficiency. We believe that a high-quality construction process contributes to the well-being of both the home and the surrounding environment.